About Us   |   Services   |   Tariff Plans  |   Consumers  |   Feedback  |  Contact Us  |  Tenders  |   Search  |   Sitemap  |   Home

Power Supply in 24 Hours

Consumer Billing Center

Consumption Calculator

Consumer Grievance

Complaint Handling and Redressal Standards

Consumer Grievance Handling Procedure

Consumer Grievance Redressel Forum

Tips to Consumers

Safety Measures

Micro Feeder Franchise(MFF)

List of ATP centers

Interaction Meetings
with Consumers

Online Consumer Services

Frequently Asked Questions

Manual for Maintenance of Distribution System

Safety Manual

Special Scheme to HT Industries

Home » Consumers » Special Scheme to HT Industries


Introduction of Rs. 3.80 Special Scheme to HT Industries covered under HT2(A) Tariff.


1. KERC, while approving the revision of Electricity Tariff – 2003 has approved a special incentive scheme to HT Industrial Consumers covered under HT2(A) Tariff at a rate of Rs. 3.80 per unit plus Tax.


2. This scheme is applicable to all HT2(A) consumers in the State subject to the eligibility mentioned below:


3. Eligibility: The consumption over and above the base consumption fixed for a month is eligible for Rs. 3.80 Tariff under this scheme. The base period is defined as the past 12 months consumption. The base consumption is to be determined with reference to the consumption from 01.12.2002 to 30.11.2003 irrespective of the date of request by the consumer. The base consumption is to be the average monthly billed energy supplied by ESCOM’s during base period. Energy consumed under this special scheme, if any, during base period is not be accounted for arriving at base consumption.


4. Rate : The rate applicable for eligible consumption under the scheme is Rs. 3.80 Paise per unit plus Tax. All other consumption shall be billed at the prevailing Tariff.


5. For new consumers, the scheme is available upon their completion of 12 calendar months. The base period and base consumption is to be calculated accordingly.


6. In order to avail the special scheme, 20% increase in contract demand is to be allowed to the availing consumers during the currency of the scheme without any special request from the consumers. Penalty for exceeding maximum demand for the consumers availing the scheme thus would be 120% of the sanctioned contract demand. The minimum billing demand shall also be enhanced accordingly.


7. In respect of eligible consumers, who increase their contract demand on a permanent basis during the currency of this special scheme, existing base consumption is to be increased at a rate of 100 KWH / KVA per month from the month in which additional contract demand has come into effect.


8. No additional security deposit is to be levied for the units consumed under the scheme.


9. The scheme is to be initially in operation with the terms and conditions mentioned above, for a period of 12 months from 01.01.2004.


10. Request for the allotment of additional energy under this scheme from the eligible HT Industries covered under HT2(A) Tariff is to be sent to the following address, duly indicating the quantum of additional units required per month under this special scheme and by enclosing the copies of the HT bills from January – 2003 to December – 2003 (i.e. bills on 01.01.2003 to 01.12.2003).


ADDRESS:

The General Manager (Technical)

Bangalore Electricity Supply Company Limited,

II Floor, K.R. Circle,

Bangalore – 560 001.

PH : 080 - 2352487

FAX : 080 – 2208936

E-Mail : gmtech@bescom.org